Sunday, 25 October 2009

Friday 23rd October
Attentive students from Bridgwater College looking at the re-excavated and extended Trench 1.

More of the new trench has been cleared back and the 'corner' of the wall can be seen clearly. The soil outside this feature is completely clean while inside is full of stone. The baulk in the middle is protecting a later pipeline, which is still in use.


Students continued with the Garden Wall survey. This photo shows the join between an older and a newer stretch of wall, and an arched gateway.

0 comments:

Post a Comment